The Murder Room Basement Bathroom Part.5

PROGRESSSS

Laying the floor tile down was huge. We liked the faux wood pattern tiles and took care to stagger the placement. With such a small room, there were a lot of cuts to make. Cutting tile with a wet saw in the dark in the cold of mid December isn’t exactly pleasant, so I’m pretty glad we’ve moved past that..

 

4_24_2012DSC_0017_238

 

I finally got to use my new table saw to rip some pineboard trim. That thing is pretty sweet.

 

IMG_1083

 

We also had the plumber come by and do the final touches with the appliances. It did require some last minute changes, but luckily the damage is hidden.

 

IMG_1084

 

The ceiling was more manageable than we thought it would be, being able to tackle it in only two work nights. GO US.

 

IMG_1087

 

4_24_2012DSC_0029_247

 

4_24_2012DSC_0031_249